{"id":24165,"date":"2021-12-03T13:11:38","date_gmt":"2021-12-03T13:11:38","guid":{"rendered":"https:\/\/www.sweco.dk\/services\/water-energy-and-industry\/wastewater-treatment\/"},"modified":"2026-02-20T12:05:11","modified_gmt":"2026-02-20T12:05:11","slug":"wastewater-treatment","status":"publish","type":"page","link":"https:\/\/www.sweco.dk\/en\/services\/water-energy-and-industry\/wastewater-treatment\/","title":{"rendered":"Wastewater treatment"},"content":{"rendered":"<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h1>Wastewater treatment<\/h1>\n<p>Many wastewater treatment plants are facing challenges caused by increased rainfall and continued urbanisation which put a strain on our sewer systems. In order to reduce the impact on these plants, we are working on several retention and pretreatment projects.<\/p>\n<p>We also provide solutions to prevent harmful substances and wastewater from hospitals, such as radioactive isotopes and microplastics, from entering aquatic environments.<\/p>\n<p>In recent years, we have made wastewater treatment plants more sustainable by implementing solutions that help convert the plants from energy-consuming to energy-producing plants, for example by supplying biogas to the City of Copenhagen.<\/p>\n\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n\n\n<section class=\"block block--white architect-columns\" >\n\n\t<div class=\"block__inner architect-columns__inner\">\n\t\t<div class=\"col--11 col--stretch col--wrapper architect-columns__grid\">\n\t\t\t\n\t\t\t\t<div class=\"col col--top col--6\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"col__inner\" data-clickable=\"false\">\n\t\t\t\t\t\t<div class=\"col__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<em class=\"title\">Faxe Spildevand<\/em><span class=\"sep\"><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<em class=\"name\">Faxe<\/em>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"524\" src=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-800x524.jpg\" class=\"attachment-architect-col--big size-architect-col--big\" alt=\"\u00c5l\u00f8b ved et hus 2\" srcset=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-800x524.jpg 800w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-300x196.jpg 300w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-1024x671.jpg 1024w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-768x503.jpg 768w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-1536x1006.jpg 1536w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-2048x1341.jpg 2048w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-520x341.jpg 520w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-458x300.jpg 458w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/FaxeSpildevand1-1-e1614006366122.jpg 1680w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/>\n\t\t\t\t\t\t\n\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\n\t\t\t\n\t\t\t\t<div class=\"col col--top col--6\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"col__inner\" data-clickable=\"false\">\n\t\t\t\t\t\t<div class=\"col__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<em class=\"title\">Sustainable heating supply for Lalandia<\/em><span class=\"sep\"><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<em class=\"name\">Lalandia S\u00f8ndervig<\/em>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"524\" src=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-800x524.jpg\" class=\"attachment-architect-col--big size-architect-col--big\" alt=\"Lalandia visualisering\" srcset=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-800x524.jpg 800w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-300x196.jpg 300w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-1024x670.jpg 1024w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-768x503.jpg 768w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-1536x1006.jpg 1536w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-520x340.jpg 520w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering-458x300.jpg 458w, https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/lalandia_visualisering.jpg 1680w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/>\n\t\t\t\t\t\t\n\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\n\t\t\t\t<\/div>\n<\/section>\n\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h2>Structural plan for wastewater management<strong><br \/>\n<\/strong><\/h2>\n<p>Our consultancy is currently focused specifically on analysis and implementation of a future-proof structural plan for wastewater management. We aim to create a basis for making well-informed decisions to close small wastewater treatment plants, renovate existing plants, prolong their life or build new modern mega plants.<\/p>\n<p>The work requires close cooperation with local decision-makers and users of the wastewater system to enable us to plan and implement the right solutions and avoid making bad investments. Sometimes the right solution is a modular expansion of a waterworks or wastewater treatment plant.<\/p>\n<h2>Liasing with authorities<strong><br \/>\n<\/strong><\/h2>\n<p>We have vast experience with the regulatory process and all the required permits and authorisations in relation to noise, odours and OHS. We know what it takes and always make sure that we obtain the relevant permits in a timely manner.<\/p>\n<div class=\"buttons-wrapper buttons-wrapper--left\"><\/div>\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n\n\n    <section class=\"block block--white related-content\" >\n        <div class=\"block__inner related-content__inner\">\n            <div class=\"col--11 col--wrapper col--start col--stretch col--bottom \">\n                                    <div class=\"col col--12 editor-content related-content__title\">\n                        <h2 class=\"h2 hyphenate\">Related services<\/h2>                    <\/div>\n                \n                                    <div class=\"col col--4 item item--img\">\n\n                                                    <a href=\"https:\/\/www.sweco.dk\/en\/services\/water-energy-and-industry\/sector-coupling\/\" title=\"Sector coupling\" >\n                                <div class=\"item__title\">\n                                    <p class=\"h4 hyphenate\">Sector coupling<\/p>                                    <p class=\"item__title--info\">\n                                                                                                                                                            <\/p>\n                                <\/div>\n                                <figure class=\"item__image\">\n                                    <img loading=\"lazy\" decoding=\"async\" width=\"520\" height=\"296\" src=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/sektorkobling_solenergi1-520x296.jpg\" class=\"attachment-insights-featured size-insights-featured\" alt=\"Solceller\" \/>                                <\/figure>\n                            <\/a>\n                        \n                                            <\/div>\n                                    <div class=\"col col--4 item item--img\">\n\n                                                    <a href=\"https:\/\/www.sweco.dk\/en\/services\/water-energy-and-industry\/water-supply\/\" title=\"Water supply\" >\n                                <div class=\"item__title\">\n                                    <p class=\"h4 hyphenate\">Water supply<\/p>                                    <p class=\"item__title--info\">\n                                                                                                                                                            <\/p>\n                                <\/div>\n                                <figure class=\"item__image\">\n                                    <img loading=\"lazy\" decoding=\"async\" width=\"520\" height=\"296\" src=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2021\/02\/yangon_myanmar1-520x296.jpg\" class=\"attachment-insights-featured size-insights-featured\" alt=\"Myanmar projekt overview 2\" \/>                                <\/figure>\n                            <\/a>\n                        \n                                            <\/div>\n                                    <div class=\"col col--4 item item--img\">\n\n                                                    <a href=\"https:\/\/www.sweco.dk\/en\/services\/water-energy-and-industry\/environment\/\" title=\"Environment\" >\n                                <div class=\"item__title\">\n                                    <p class=\"h4 hyphenate\">Environment<\/p>                                    <p class=\"item__title--info\">\n                                                                                                                                                            <\/p>\n                                <\/div>\n                                <figure class=\"item__image\">\n                                    <img loading=\"lazy\" decoding=\"async\" width=\"520\" height=\"296\" src=\"https:\/\/www.sweco.dk\/wp-content\/uploads\/sites\/4\/2022\/06\/mastrupsoerne_02-520x296.jpg\" class=\"attachment-insights-featured size-insights-featured\" alt=\"Mastrup S\u00f8erne\" \/>                                <\/figure>\n                            <\/a>\n                        \n                                            <\/div>\n                \n                            <\/div>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":16,"featured_media":12199,"parent":24005,"menu_order":7,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"Wastewater treatment - Sweco Danmark","_seopress_titles_desc":"We advise in the field of wastewater and help to analyze and implement a future-proof structural plan for wastewater management and treatment.","_seopress_robots_index":"","footnotes":""},"class_list":["post-24165","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/pages\/24165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/comments?post=24165"}],"version-history":[{"count":15,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/pages\/24165\/revisions"}],"predecessor-version":[{"id":60282,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/pages\/24165\/revisions\/60282"}],"up":[{"embeddable":true,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/pages\/24005"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/media\/12199"}],"wp:attachment":[{"href":"https:\/\/www.sweco.dk\/en\/wp-json\/wp\/v2\/media?parent=24165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}